Office renovation – 3 months​

Jobs:

  • demolition of partition walls and ceilings
  • reconstruction of the sprinkler system
  • conversion of an automatic fire alarm system (ATS)
  • high voltage system alteration
  • water supply reconstruction
  • sewerage reconstruction
  • ventilation system reconstruction
  • reconstruction of the heating and cooling system
  • construction of light partition walls
  • installation of acoustic suspended ceilings
  • painting
  • installation of doors and glass partitions
  • installation of floor and wall coverings
  • tiling works
  • installation of sanitary equipment
  • stage construction